The 6.49 km stretch will connect patna junction to isbt, offering faster, modern travel for daily. The metro rail trial runs on the priority corridor from malahi pakri to new isbt, which were slated to begin on aug 15, is now expected to start around sept 20, with an. [4][5] construction will be completed over five phases, and the transit system would be owned.
सफल परीक्षणों के बाद 15 अगस्त 2025 से मलाही पकड़ी से न्यू isbt तक मेट्रो सेवा शुरू होने की उम्मीद है. Check expected launch date, route, other details the patna metro is expected to benefit over a million passengers from the bihar. Here are all the details you need to know.
Patna metro completes first successful trial run: After years of waiting, the city’s first 6.5 km metro stretch is set to roll out on august 15, 2025. Originally planned to be inaugurated on august 15, the operation of the patna metro will begin only after mandatory safety checks are completed. राज्य ब्यूरो, पटना। नए साल का स्वतंत्रता दिवस पटना के लोगों के लिए मेट्रो का उपहार लेकर आने वाला है। राज्य सरकार ने 15 अगस्त 2025.
The first trial run of the metro was successful at the bairia metro depot. Patna metro’s blue line is set to begin operations by august 15, 2025. Patna metro (patna mrts) is a rapid transit system being constructed in the city of patna, india.